Solar Panels in Charlotte, NC
Charlotte gets 4.7 peak sun hours/day with electricity at $0.128/kWh. Calculate panels needed, cost after 30% ITC, and payback period.
Sun Hours
4.7/day
Rate
$0.128/kWh
Cost/Watt
$2.65
Net Metering
Yes
☀️ Charlotte Solar Calculator
8,984 kWh
Panels
200
System Size
80.0 kW
Annual kWh
109,792
Net Cost
$148,400
Savings/yr
$14,053
Payback
10.6 yrs
25-Yr Savings
$202,925
System Sizes in Charlotte
| Monthly kWh | Panels | kW | Net Cost | Savings/yr | Payback |
|---|---|---|---|---|---|
| 500 | 12 | 4.8 | $8,904 | $843 | 10.6 yrs |
| 750 | 17 | 6.8 | $12,614 | $1,195 | 10.6 yrs |
| 1,000 | 23 | 9.2 | $17,066 | $1,616 | 10.6 yrs |
| 1,500 | 34 | 13.6 | $25,228 | $2,389 | 10.6 yrs |
| 2,000 | 45 | 18.0 | $33,390 | $3,162 | 10.6 yrs |
| 2,500 | 56 | 22.4 | $41,552 | $3,935 | 10.6 yrs |
Solar Guide for Charlotte (2026)
Charlotte at latitude 35.23°N receives 4.7 peak sun hours/day. At $0.128/kWh, solar offers solid long-term savings.
Incentives: Federal ITC + Duke Energy rebate.
NEC Solar Requirements
All installations must comply with NEC Article 690: rapid shutdown (690.12), conductor sizing at 125% (690.8), and proper grounding per NEC 250. Use our Solar Wire Size Calculator for conductor sizing.
Disclaimer: Estimates only. Consult a licensed solar installer. NEC Article 690 compliance required.
Frequently Asked Questions
Related Calculators
Solar Calculator by City
New York City
3.6 hrs · $0.225/kWh
Los Angeles
5.6 hrs · $0.28/kWh
Chicago
3.9 hrs · $0.155/kWh
Houston
5 hrs · $0.135/kWh
Phoenix
6.6 hrs · $0.138/kWh
Philadelphia
3.9 hrs · $0.162/kWh
San Antonio
5.3 hrs · $0.125/kWh
San Diego
5.7 hrs · $0.35/kWh
Dallas
5.1 hrs · $0.13/kWh
Austin
5.2 hrs · $0.125/kWh
Denver
5.5 hrs · $0.148/kWh
Miami
5.3 hrs · $0.148/kWh
Atlanta
4.7 hrs · $0.135/kWh
Seattle
3.2 hrs · $0.115/kWh
Boston
3.8 hrs · $0.27/kWh
Las Vegas
6.4 hrs · $0.13/kWh
Portland
3.5 hrs · $0.13/kWh
Minneapolis
4 hrs · $0.145/kWh
Tampa
5.4 hrs · $0.142/kWh
San Francisco
5 hrs · $0.3/kWh
Detroit
3.5 hrs · $0.185/kWh
Nashville
4.4 hrs · $0.125/kWh
Salt Lake City
5.3 hrs · $0.115/kWh
Raleigh
4.7 hrs · $0.125/kWh
Sacramento
5.5 hrs · $0.25/kWh
Orlando
5.3 hrs · $0.145/kWh
San Jose
5.3 hrs · $0.3/kWh
Tucson
6.4 hrs · $0.135/kWh
Albuquerque
6.2 hrs · $0.14/kWh
See also: Solar in North Carolina