Solar Panels in Minneapolis, MN
Minneapolis gets 4 peak sun hours/day with electricity at $0.145/kWh. Calculate panels needed, cost after 30% ITC, and payback period.
Sun Hours
4/day
Rate
$0.145/kWh
Cost/Watt
$3.05
Net Metering
Yes
☀️ Minneapolis Solar Calculator
6,552 kWh
Panels
171
System Size
68.4 kW
Annual kWh
79,891
Net Cost
$146,034
Savings/yr
$11,584
Payback
12.6 yrs
25-Yr Savings
$143,566
System Sizes in Minneapolis
| Monthly kWh | Panels | kW | Net Cost | Savings/yr | Payback |
|---|---|---|---|---|---|
| 500 | 14 | 5.6 | $11,956 | $948 | 12.6 yrs |
| 750 | 20 | 8.0 | $17,080 | $1,355 | 12.6 yrs |
| 1,000 | 27 | 10.8 | $23,058 | $1,829 | 12.6 yrs |
| 1,500 | 40 | 16.0 | $34,160 | $2,710 | 12.6 yrs |
| 2,000 | 53 | 21.2 | $45,262 | $3,590 | 12.6 yrs |
| 2,500 | 66 | 26.4 | $56,364 | $4,471 | 12.6 yrs |
Solar Guide for Minneapolis (2026)
Minneapolis at latitude 44.98°N receives 4 peak sun hours/day. At $0.145/kWh, solar offers solid long-term savings.
Incentives: Federal ITC + Xcel Solar*Rewards.
NEC Solar Requirements
All installations must comply with NEC Article 690: rapid shutdown (690.12), conductor sizing at 125% (690.8), and proper grounding per NEC 250. Use our Solar Wire Size Calculator for conductor sizing.
Disclaimer: Estimates only. Consult a licensed solar installer. NEC Article 690 compliance required.
Frequently Asked Questions
Related Calculators
Solar Calculator by City
New York City
3.6 hrs · $0.225/kWh
Los Angeles
5.6 hrs · $0.28/kWh
Chicago
3.9 hrs · $0.155/kWh
Houston
5 hrs · $0.135/kWh
Phoenix
6.6 hrs · $0.138/kWh
Philadelphia
3.9 hrs · $0.162/kWh
San Antonio
5.3 hrs · $0.125/kWh
San Diego
5.7 hrs · $0.35/kWh
Dallas
5.1 hrs · $0.13/kWh
Austin
5.2 hrs · $0.125/kWh
Denver
5.5 hrs · $0.148/kWh
Miami
5.3 hrs · $0.148/kWh
Atlanta
4.7 hrs · $0.135/kWh
Seattle
3.2 hrs · $0.115/kWh
Boston
3.8 hrs · $0.27/kWh
Las Vegas
6.4 hrs · $0.13/kWh
Portland
3.5 hrs · $0.13/kWh
Tampa
5.4 hrs · $0.142/kWh
Charlotte
4.7 hrs · $0.128/kWh
San Francisco
5 hrs · $0.3/kWh
Detroit
3.5 hrs · $0.185/kWh
Nashville
4.4 hrs · $0.125/kWh
Salt Lake City
5.3 hrs · $0.115/kWh
Raleigh
4.7 hrs · $0.125/kWh
Sacramento
5.5 hrs · $0.25/kWh
Orlando
5.3 hrs · $0.145/kWh
San Jose
5.3 hrs · $0.3/kWh
Tucson
6.4 hrs · $0.135/kWh
Albuquerque
6.2 hrs · $0.14/kWh
See also: Solar in Minnesota